First project

For Flowcode users to discuss projects, flowcharts, and any other issues related to Flowcode 2 and 3.

Moderators: Benj, Mods

Post Reply
tecnaudio
Posts: 1
Joined: Fri Mar 07, 2008 3:11 pm
Contact:

First project

Post by tecnaudio »

I am a hobbyist and this is the first project in flowcode, basically is a clock time base generator, in normal operation that generates an output signal in RA0 with 60s in level 1 and 60s level 0, reversed in the output RA1, when activated the interruption in RB0 will generate a signal with about 4s at level 1 and 4s at level 0, when it disables the interruption in RB0 this is a reset the meter of the 60s.
Can we simplify the flowchart more? Send me your opinion.
Best regards
Carlos - Portugal
Attachments
relogio4d.fcf
(14 KiB) Downloaded 308 times

Post Reply